Información del Proyecto

Description

The project includes the execution of a branch that starts from the current Bobadilla - Granada Line and runs parallel to the Antequera-Granada High Speed Line Platform until it reaches the southern platform of the Antequera High Speed Station.
The branch consists of a single track with a width of 1,668 mm, without electrification with a length of 2,300.64 m. Upon arrival at the station, at PK 1 + 685, there is a mango track to the left of the branch, which is 354.24 m long. The project also includes three structures: a ditch located in PK 1 + 167, a transverse drainage work located in PK 1 + 223 and a sanitation work in PK 1 + 366.