Description

The purpose of this project is the definition of a breakwater at the east end of the beach that allows the protection of the waterfront and prevents the loss of sediment, as well as the feedback of this beach area to achieve an increase in beach width dry
In June 2018, prior to the drafting of this construction project, the Study of Alternatives of the Regeneration Project of Cola Beach T.M. was written. Eagles (Murcia). It concludes that the best option for the defense of the beach is the construction of a breakwater and the artificial recharge of the beach in the eastern part of it.